maruwai coal million

maruwai coal million

Maruwai Coal Project - Global Energy Monitor

The Maruwai Coal Project is a proposed joint venture between BHP Billiton (75%) and Adaro Indonesia (25%) to develop seven 'Coal Contracts of Work' (CCoWs) located in East and Central Kalimantan in Indonesia. In an April 2010 media release announcing the joint venture, BHP Billiton stated that the "undeveloped metallurgical and thermal coal resources are estimated at 774 million tonnes."

IndoMet Coal Project - Global Energy Monitor

The IndoMet Coal Project (ICP) (which was initially referred to by BHP Billiton as the Maruwai coal project), covers five potential coal deposits in East and Central Kalimantan in Indonesia. The coal deposits were discovered by BHP Billiton in the late 1990's but initial development of the first of the five deposits within the broad project area - the Haju coal project-- did not commence until ...

BHP takes first step into Maruwai - MiningMonthly

Jun 24, 2008  The Maruwai coal deposit in Central and East Kalimantan was discovered by BHP Billiton Minerals Exploration in the late 1990s. BHP said the Haju mine is a "small, discrete" coal deposit that will initially produce about 1 million tonnes per annum of metallurgical coal, with expansion potential to approximately 2Mtpa.

A Hunger for Coal Threatens The Heart of Borneo – The ...

May 27, 2014  Maruwai, sits within 15 kilometers of the Asmin Koalindo Tuhup and Marunda Graha Mineral coal mines, according to Timor. The mines, two of Central Kalimantan’s biggest, have produced 19 million tons of coal in the last 10 years, according to government statistics

BHP Billiton Approves Maruwai Stage One Coal Development ...

Jun 24, 2008  BHP Billiton announce approval of the stage one development of the Maruwai metallurgical coal basin in Indonesia for a capital investment of approximately US$100 million. Maruwai is the generic name for a large, high quality metallurgical coal deposit in Central and East Kalimantan that was discovered by BHP Billiton Minerals Exploration in the ...

PETROSEA RESULTS FOR THE YEAR 2018

Maruwai Coal for civil concrete utilities infrastructure works. ... million BCM and total coal production volume increased by 39.74% yoy from 24.76 million to 34.60 million tons in 2018. Engineering Construction business line contributed US$130.28 million ...

Adaro

Adaro Mining. PT Adaro Indonesia. PT Adaro Indonesia (AI) is the Adaro Group’s largest mining company, which mainly runs coal mining operations in South Kalimantan and Central Kalimantan under a Coal Cooperation Agreement (CCA) with the Government of Indonesia until 2022 with the right to extend the contract period based on the terms and conditions in the PKP2B and the applicable laws and ...

PT MARUWAI COAL LAPORAN EKSPLORASI BULAN

PT Maruwai Coal juga telah mendapatkan Izin Pinjam Pakai Kawasan Hutan (IPPKH) untuk kegiatan Operasi Produksi dari Menteri Kehutanan dengan Nomor SK.99/Menhut-II/2013 tanggal 06 Februari 2013 yang berlaku selama 5 tahun, untuk wilayah seluas 5.261,45 Ha yang secara administratif

Petrosea Raih Kontrak Rp1,2 Triliun Garap Tambang Maruwai Coal

Jun 20, 2017  Maruwai Coal merupakan satu dari tujuh kontrak pengusahaan batu bara di Kalimantan Tengah dan Timur yang dimiliki IndoMet Coal. Saat ini seluruh saham IndoMet dikuasai PT Adaro Energy Tbk (ADRO). Petrosea pada tiga bulan pertama 2017 membukukan pendapatan US$58,46 juta, naik 37,18% dibanding periode yang sama 2016. Pendapatan Petrosea sebagian ...

BHP prices choke on coke, as if we didn't know

Jun 10, 2009  Haju was a Maruwai coal project development. ... The plan was to crank that up to between 55 million and 100 million tonnes by 2009-10, with a later charge of up to 200 million

A Hunger for Coal Threatens The Heart of Borneo – The ...

May 27, 2014  Maruwai, sits within 15 kilometers of the Asmin Koalindo Tuhup and Marunda Graha Mineral coal mines, according to Timor. The mines, two of Central Kalimantan’s biggest, have produced 19 million tons of coal in the last 10 years, according to government statistics

Petrosea Tak Rela Bank Garansi Rp60 Miliar di Bank Mandiri ...

Pada 18 Desember 2020, Petrosea menerima invoice dari Maruwai Coal untuk pembayaran senilai Rp60,01 miliar dalam jangka waktu 30 hari. “Perseroan sangat tidak setuju dengan invoice dan telah menyampaikan penjelasan atas keberatan kepada PT Maruwai Coal,” tulis Meinar dalam pernyataannya kepada Otoritas Bursa, Rabu (27/1).

BHP Billiton Approves Maruwai Stage One Coal Development ...

Jun 24, 2008  BHP Billiton announce approval of the stage one development of the Maruwai metallurgical coal basin in Indonesia for a capital investment of approximately US$100 million. Maruwai is the generic name for a large, high quality metallurgical coal deposit in Central and East Kalimantan that was discovered by BHP Billiton Minerals Exploration in the ...

PETROSEA RESULTS FOR THE YEAR 2018

Maruwai Coal for civil concrete utilities infrastructure works. ... million BCM and total coal production volume increased by 39.74% yoy from 24.76 million to 34.60 million tons in 2018. Engineering Construction business line contributed US$130.28 million ...

PTBA sets flat high CV coal output target in 2021

Mar 13, 2021  Indonesian Coal Book 2018/2019 Indonesian Coal Report Issue 17 Petrosea, Maruwai Coal reach amicable settlement

Adaro Targets 35% Growth in Coking Coal Output

Apr 23, 2018  Among the concessions is the Maruwai mine, where BHP had aimed to produce 6 million tonnes a year of thermal and coking coal by 2020, an expansion estimated to cost up to $1 billion. At that time, Maruwai's undeveloped thermal and coking coal resources were estimated at 774 million tons.

BHP Billiton Metallurgical Coal - SourceWatch

Maruwai – Dave Murray ... • BHP Billiton is focused on the growing market for metallurgical coal, targeting 100 million tonnes by 2010 in response to the market. John Smith CEO. BMA Operations 27

BHP prices choke on coke, as if we didn't know

Jun 10, 2009  Haju was a Maruwai coal project development. ... The plan was to crank that up to between 55 million and 100 million tonnes by 2009-10, with a later charge of up to 200 million

Boyish Ambition

Sep 13, 2011  To diversify Adaro agreed last year to pay $335 million to take a 25% stake in the Maruwai coal project in East Kalimantan, joining with Australian miner BHP Billiton, which owns the rest.

Coal in East Kalimantan: taking the toxic tour Down to Earth

Indra Diannanjaya of PT Juloi Coal, one of BHP's local subsidiaries at Maruwai, said the company would instead sell a minority 20-25% stake in the project. He was quoted by Reuters as saying that the project was expected to start commercial production in 2014, with output reaching 6 million tonnes of both thermal and coking coal within five years.

BankTrack – IndoMet Coal Project

Oct 17, 2016  The IndoMet Coal Project, which was initially referred to by BHP Billiton as the Maruwai coal project, covers five potential coal deposits in East and Central Kalimantan in Indonesia. Latest developments. PT Adaro Energy Tbk (ADRO) completed purchase of IndoMet coal mine project worth USD120 million ... (ADRO) completed purchase of IndoMet coal ...

Indonesia's Adaro targets 35 pct growth in coking coal ...

Apr 23, 2018  Among the concessions is the Maruwai mine, where BHP had aimed to produce 6 million tonnes a year of thermal and coking coal by 2020, an expansion estimated to cost up to $1 billion.

BHP approves $100m Indonesia metallurgical coal project

Jun 24, 2008  The Haju mine was a small coal deposit within the Maruwai basin that would initially produce about one-million tons a year of metallurgical coal, with expansion potential to two-million tons a

Adaro MetCoal Stage 1 coal mine Report Wood Mackenzie

Oct 23, 2020  Adaro MetCoal Stage 1 is a metallurgical coal mine located in the Murung Raya regency in Central Kalimantan. The mine includes metallurgical coal mining areas of Haju (Lahai concession) and Lampunut (Maruwai concession). The two concessions within Adaro MetCoal Stage 1 span a total of 668 square kilometres.

Maruwai progress - Mining Journal

Jan 01, 2014  INDONESIA: BHP Billiton’s plans to develop the $US350 million greenfield Maruwai metallurgical coal field in Kalimantan, Indonesia, are moving up a gear with the...

Petrosea Tak Rela Bank Garansi Rp60 Miliar di Bank Mandiri ...

Pada 18 Desember 2020, Petrosea menerima invoice dari Maruwai Coal untuk pembayaran senilai Rp60,01 miliar dalam jangka waktu 30 hari. “Perseroan sangat tidak setuju dengan invoice dan telah menyampaikan penjelasan atas keberatan kepada PT Maruwai Coal,” tulis Meinar dalam pernyataannya kepada Otoritas Bursa, Rabu (27/1).

Petrosea objected to the disbursement of IDR 60.01 billion ...

Jan 28, 2021  JAKARTA - PT Petrosea Tbk (PTRO) filed an objection to PT Maruwai Coal (MC) regarding the disbursement of bank guarantee amounting to IDR 60.01 billion. This was conveyed by Meinar Kusumastuti, Director of PTRO, in an information disclosure quoted on Thursday (28/1). She conveyed that PTRO took legal steps against the disbursement of bank ...

IndoMet project, coal mining in East and Central ...

The IndoMet Coal Project, which was initially referred to by BHP Billiton as the Maruwai coal project, covers five potential coal deposits in East and Central Kalimantan in Indonesia. In 2016 a part of it was sold to Adaro. The concessions contain more than 1.2 billion tonnes of metallurgical and thermal coal that would be shipped to Asian markets.

PTBA sets flat high CV coal output target in 2021

Mar 13, 2021  Indonesian Coal Book 2018/2019 Indonesian Coal Report Issue 17 Petrosea, Maruwai Coal reach amicable settlement

PETROSEA RESULTS FOR THE YEAR 2018

Maruwai Coal for civil concrete utilities infrastructure works. ... million BCM and total coal production volume increased by 39.74% yoy from 24.76 million to 34.60 million tons in 2018. Engineering Construction business line contributed US$130.28 million ...

Adaro Targets 35% Growth in Coking Coal Output

Apr 23, 2018  Among the concessions is the Maruwai mine, where BHP had aimed to produce 6 million tonnes a year of thermal and coking coal by 2020, an expansion estimated to cost up to $1 billion. At that time, Maruwai's undeveloped thermal and coking coal resources were estimated at 774 million tons.

Indonesia's Adaro targets 35 pct growth in coking coal ...

Apr 23, 2018  Among the concessions is the Maruwai mine, where BHP had aimed to produce 6 million tonnes a year of thermal and coking coal by 2020, an expansion estimated to cost up to $1 billion.

BHP prices choke on coke, as if we didn't know

Jun 10, 2009  Haju was a Maruwai coal project development. ... The plan was to crank that up to between 55 million and 100 million tonnes by 2009-10, with a later charge of up to 200 million

Coal in East Kalimantan: taking the toxic tour Down to Earth

Indra Diannanjaya of PT Juloi Coal, one of BHP's local subsidiaries at Maruwai, said the company would instead sell a minority 20-25% stake in the project. He was quoted by Reuters as saying that the project was expected to start commercial production in 2014, with output reaching 6 million tonnes of both thermal and coking coal within five years.

Ministry Amends 13 Coal Contracts; 18 More before Next ...

Nov 15, 2017  The 13 PKP2Bs comprises of four first-generation contracts for Arutmin Indonesia, Kaltim Prima Coal, Berau Coal, and PT Kideco Jaya Agung; on second-generation contract under Barasentosa Lestari; and eight third-generation PKP2Bs for Intitirta Primasakti, Juloi Coal, Kalteng Coal, Lahai Coal, Maruwai Coal, Pari Coal, Ratah Coal, and Sumber Barito Coal.

BHP Billiton Considers to Stop Operations at its ...

Apr 22, 2016  The Tambang Haju mine is estimated to contain around 1.27 billion tons of coal. IndoMet Coal also controls concessions in the following coal projects on the island of Kalimantan: Lahai Coal, Ratah Coal, Juloi Coal, Pari Coal, Sumber Barito Coal, Kalteng Coal, and Maruwai Coal (since September 2015 IndoMet Coal has been selling its coal output).

TABLE OF CONTENTS

Tolak Bank Garansi Maruwai Coal, Begini Rencana Emiten Milik Lo Kheng Hong (PTRO) Antam (ANTM) has a bauxite export permit of 1.89 million tons until 2022 Antam (ANTM) kantongi izin ekspor bauksit 1,89 juta ton hingga tahun 2022 PTBA Optimistic 0% Coal Royalty to Drive DME Project PTBA Optimistis Royalti Batubara 0% Dorong Proyek DME

BHP Billiton Borneo coal mine: Local villagers want it stopped

Aug 14, 2015  Maruwai’s 700 inhabitants appeared to be evenly split over whether mining should be supported, Ms Denton said, but those who opposed it were fired up. ... could eventually produce five million ...